FORGING HAMMERS
Advantages include:
– Considerable reduction in construction time and cost.
The foundation block is no longer required, and the foundation pit is much smaller.
– Equipment (hammers, presses, and sensitive equipment) can be installed in close proximity.
– Production cycles are improved. Hammers can operate with faster blow rates, and can be operated for longer periods of time.
– Vibrations are reduced by at least 80%, compared to conventional foundations.
– Foundation settlement and tilting are eliminated.
GERB offers:
– Elastic foundation design
– Worldwide supply of spring-Visco-damper® systems
– Complete civil engineering support, including vibration surveys and assessments, soil assessments, and pit design, including general arrangement drawings, reinforcement drawings and rebar schedules
– Installation or installation supervision.