One million-pound GERB Tuned Mass Damper in Uptown Manhattan
Welding fixtures are one of the most important devices for an automotive body welding assembly line to achieve the required accuracy on the welded panels and therefore a great smooth look on the finished car’s body.

GERB Floating Slab Track – Valley Line LRT, Edmonton, Alberta
The Valley Line LRT is an ambitious 13-kilometer rail project awarded to TransEd Partners with a budget of approximately 1.8 billion. This design-build endeavor includes a 30-year operational commitment, with the initial lines marking a significant milestone in modern urban transit development.

Half a million-pound GERB LFRS Tuned Mass Damper in Uptown Manhattan
Low friction rail system TMDs offer cost-effective, compact designs with tuning capabilities for different frequencies in x and y directions. Designed to match the skyscraper’s as-built frequency, this mechanical marvel ensures stability against wind and seismic forces.

GERB Tuned Mass Dampers at Boston University – CCDC Campus
Designed, and built Commercial Retaining walls larger than 100’, and more than 6’ high. All designs are certified with a P. Eng stamp, and built according to municipal code, and with legal city permits.

20 Ton GERB Tuned Mass Damper – Grand Quay Observation Tower, Montreal
Installed a 20 ton, tuned-mass damper in a cantilevered structure at Port Montreal. This state-of-the-art observation tower located at Montreal’s waterfront, provides breathtaking views of the city and some of Grand Quay’s many attractions.

GERB Tuned Mass Dampers at Totem Lake Connector Bridge in Kirkland, WA
esigned and fabricated a robotic recycling machine for a next generation e-waste sorting and recycling facility.
Combined multi-stage Eddy current and computer vision metal and plastic separator by using a robotic arm with a maximum speed of 3.75 m/s.

GERB Tuned Mass Dampers at Waller Creek Bridges, Austin, TX
Bridges are designed to be strong and resilient, but even well-engineered structures can experience vibrations from pedestrian foot traffic. At the Waller Creek Bridges in Austin, TX, this challenge became evident, prompting the need for an effective vibration mitigation solution.

20 Tons Shipping Crate – GE Canada
For GE Canada, we designed and fabricated a specialized shipping crate to transport a 10-tonne machined turbine bearing. The crate, weighing 1,500 kg, was designed to be handled with four slings and shackles, with the bearing stored inside without any support on the bottom.